Clubhouse Renovation and Reopening
Managing communications, branding, and project coordination across a full clubhouse relocation and renovation reopening
Big Canoe’s clubhouse underwent a major renovation requiring the food and beverage operation to fully relocate during construction. The temporary location needed its own identity and brand presence while the renovation ran its course. Once construction was complete, the entire operation had to move back into a significantly changed space and reopen to the community.
I served as junior project manager under my director across both phases, handling day-to-day tracking, decision documentation, cross-departmental coordination, and communications while my director provided structure and stepped in for key leadership meetings.
When the clubhouse closed for renovation, the food and beverage operation moved to a lakeside facility that needed a name, a brand, and a community identity of its own. I was part of the team that named and branded the interim location as the Lakeside Bistro, developing the identity that would carry the operation through the construction period.
Beyond the branding work, the relocation required coordinating the physical move of equipment, furniture, inventory, and staff across departments, with communications to the community at each stage.
The reopening was a full multi-department operation. Coordinating across food and beverage, technology, public safety, operations, logistics, and communications, the project involved tracking more than 140 discrete tasks from initial planning through a phased soft and grand opening in fall 2025.
A renovation reopening of this scale is one of the most complex project management environments there is. Every department is involved, every timeline is a dependency, and the community is watching. Managing it well requires holding a lot of moving pieces simultaneously without losing sight of what the opening actually needs to feel like when it happens.
This project is where the project management mindset that runs through all of my work became most visible — not just tracking tasks, but understanding how they connect, anticipating where things would slip, and keeping the team moving toward an opening date that could not move.

Leave a Reply